![]() Thanks to the crane runway, which is suspended from the roof superstructure, the floor remains free of any additional runway supports. All functions are controlled by means of a Demag DST control pendant. A locking mechanism limits the turning angle of the hook, thus ensuring a reliable and continuous supply of power to the attached turning device. ![]() The forklift production line starts in the pre-assembly zone, where the workers use a 4-tonne EPDE suspension crane to lift counterweights, turn them on a turning device and then place them on an AGV that is waiting to receive them. Pre-assembly Pre-assembly with 2 crane levels
0 Comments
Leave a Reply. |
Details
AuthorWrite something about yourself. No need to be fancy, just an overview. ArchivesCategories |